The safe control of operations is a sequence, and the sequence is what keeps people alive. We build tools that enforce it, record what actually happened, and produce the document at the end of it — rather than asking somebody to write one up afterwards.
Four operations, one spine. The register, the people and the record are shared, so a company that takes one tool is not starting again with the next.
Permit to work under the safe control of operations — raised, circulated, authorised on site, briefed, worked, handed back and closed, in that order and no other.
Purging of mains and services: the volumes, the flow rates, and a record of what was purged, where, and by whom.
The pressure, the duration, the allowable loss, and the certificate that follows from them.
The evidence handed to whoever is asking for it — the network operator, an auditor, or the company itself — built from work already recorded rather than assembled afterwards.
Built to IGEM/GL/6 Edition 3 and HSE guidance on permit-to-work systems. That is the standard the tools enforce and the wording they use, whoever is holding the permit.
The UAE and Qatar are laying new polyethylene distribution networks, and the operations are the same: excavation near live plant, flow stopping, purging, testing for soundness. Where an operator works to its own procedure rather than IGEM, the sequence and the wording are configurable. The enforcement is not.
Permit to work under IGEM/GL/6 Section 5. It will not let a permit skip a stage, nobody is named on one unless the competency register says so, and nothing is edited after the fact. Every refusal names the clause it comes from.
Built and tested. In trial on live work.
See it working